Channel works / drainage:
The large county seat Weissenburg i. Bay. wants to build a throttle shaft in the school district on the existing rainwater pipe of the district.
Before then a storage space channel for the gym and the existing facilities will be built.
Furthermore, for the construction site clearing various channels are to be moved and for the drainage of the hall, the main lines are created to the reservoir channel outside the excavation.
drainage works
Scope of the performance:
2500 m
425 m
3 St. GfK manhole DN 1200
3 St. GfK manhole DN 2000
2 St. GfK manhole DN 1500
13 bays DN 1000
4 bays DN 1200
60 m pipe up to DN 200
22 m pipe DN 250
130 m pipe DN 300
50 m pipe DN 400
75 m pipe DN 500
15 m pipe DN 600
22 m pipe DN 800
90 m pipe DN 1000
75 m pipe DN 1100