New construction of a children's home with multifunctional event and office space in Unterhaching.
The entire building has a basement, a subarea is an underground car park.
BGF 5 000 m
In the entrance area, a recycling house is being built.
Appliances:
- 8 toilet facilities,
- 5 disabled toilet facilities,
- 10 children's toilet facilities,
- 8 baby toilet facilities,
- 4 urinal facilities,
- 11 washbasin systems,
- 5 wheelchair-accessible washbasin system,
- 8 wash troughs,
- 4 vanity units for changing tables,
- 2 shower facilities,
- 8 sink system,
- 28 floor drains, 4 roof inlets,
- 1 storage charging system, 650 liters,
- 1 sewage lifting plant,
- 1 water softening system,
- 1 grease separator NS 4,
- 1 separating station,
- irrigation and drainage :,
- approx. 650 m sewage pipes,
- approx. 1,500 m drinking water pipes.