The OSZ III is to be renovated in terms of fire protection. Structurally, fire doors
built-in, ceilings, walls and floor upgraded. In the field of electrical engineering, all
To install systems in accordance with the fire protection concept and building permit. This applies to:
In particular:
1. The installation of emergency lighting with group battery systems in accordance with
MSchulBauR.
2. The extension/upgrading of the external and internal lightning protection and grounding system
according to MSchulbauR.
The following facilities are to be upgraded or newly built as part of the fire protection renovation:
become:
1. The sub-distributions.
2. The renovation of the complete electrical installation including lighting.
3. The establishment of an internal lightning protection system.
4. The upgrading of equipotential bonding.
5. The establishment of a KNX bus system for lighting and blinds as well as central commands.
6. The renewal of outdoor lighting.
7. Dismantling and disposal of the old installation.
The property is not in use during the renovation period. The self-sufficient
Kitchen area is to be kept in operation without restrictions.
The OSZ III is to be renovated in terms of fire protection. Structurally, fire doors
built-in, ceilings, walls and floor upgraded. In the field of electrical engineering, all
To install systems in accordance with the fire protection concept and building permit. This applies to:
In particular:
1. The installation of emergency lighting with group battery systems in accordance with
MSchulBauR.
2. The extension/upgrading of the external and internal lightning protection and grounding system
according to MSchulbauR.
The following facilities are to be upgraded or newly built as part of the fire protection renovation:
become:
1. The sub-distributions.
2. The renovation of the complete electrical installation including lighting.
3. The establishment of an internal lightning protection system.
4. The upgrading of equipotential bonding.
5. The establishment of a KNX bus system for lighting and blinds as well as central commands.
6. The renewal of outdoor lighting.
7. Dismantling and disposal of the old installation.
The property is not in use during the renovation period. The self-sufficient
Kitchen area is to be kept in operation without restrictions.