Route shift from the Rutschhang area near Thurnau; Premise Earthworks - VM E-105
Essentially, the measure is the erosion of the ground for a route laying of the BAB A70. The resulting masses are used at various locations to dam widening or fillings of walls.
- 250 000 m 3 Soil removal, transport and installation,