The city of Versmold is renovating the existing switchgear on the Versmold sewage treatment plant and modernizing the existing process control system PCS7. The switchgear is largely older than 20 years and has exceeded its service life limit. These are to be renewed, structured according to the current state of the art and from an economic point of view, and constructed in a way that is traceable in terms of energy technology. The maximum currents of the system are approx. 1,000 A. Two separate transformer systems are built. A network replacement system is implemented in the NSHV. The cabling must be checked, partially replaced and properly reconnected to the new systems. Automation devices are to be taken over and integrated into the new switchgear. The bus system is available and can be partially expanded. There is a two-stage negotiation process with participation competition according to VgV on the conditions specified in the publication and the participation documents.
TGA planning for the aforementioned construction measure with the following services: Technical planning TGA (service phases 1 to 9), cost group 400. Eligible costs 1 000 000.00 EUR, fee zone III below HOAI.