The new sports hall will be built on the area of the previous sports ground at the school between the school building and Waldschmidtstraße
erected. The building is mainly a reinforced concrete solid construction with EIFS. The roof of the sports hall is designed as a hipped roof. The
Roof construction is designed as an explosive device with wooden trusses and steel tension struts. Buildings for
changing rooms, plumbing, technology, equipment and gallery with a green flat roof.
Exterior building dimensions: approx. 38 x 45 m
Building height: approx. 14 m
Equipping a double sports hall with fixed sports equipment incl. 3-fold versenkreck as well as loose sports equipment.
Events:
Publication of procurement documents: 14.10.2022
Ausführungszeitraum: 16.01.2023 – 11.08.2023
Waterproofing of floor sleeves: 15.05.2023 – 16.05.2023
UK sports equipment with floor sleeves: 16.01.2023 – 25.01.2023
Installation of sports equipment Final assembly: 09.08.2023 – 11.08.2023