1. The subject of the contract is the delivery, bringing and assembly along with connection to existing installations of brand new furniture and bodies for Gdańsk University of Technology.
2. The order was divided into 7 lots:
1) Household furniture Student House No. 13;
2) Furniture in the lobby in front of the gatehouse Student House No. 13;
3) Furniture, concierge, Student House No. 13;
4) Furniture, room 2/20, Student House No. 13;
5) Additional furniture Student House No. 13;
6) Additional furniture Student House No. 2;
7) Additional furniture of Gdańsk University of Technology.
3. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly along with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
Utility furniture Student House No. 131. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend. During installation, all floors, walls, corridors, staircases, doors and elevators that will be used must be protected by the Contractor against damage. All damage caused during the assembly of furniture, as well as packaging materials (pallets, cardboard boxes, foils, tapes, polystyrene, etc.)
The Contractor shall remove on his own.
2. The dimensions quoted by the Contracting Authority must be checked before commencing the implementation (indicated on-site inspection before submitting the offer). The contractor is responsible for matching the furniture to individual rooms, inventoried by himself, on his own (with
particular attention to all sub-strings and installations existing in the building). The dimensions of the rooms in which the furniture has been designed may change due to renovation and construction works carried out in them. In the case of significant dimensional differences, any changes should be made
consult with the Ordering Party.
3. The given chipboard decors are subject to change. For valuation take the décor in the color of the board U708 ST9 Grey Light, W908 ST2 White Platinum, U702 ST9 Cashmere, Kaisersberg Oak H3349, Nebraska Oak H3331, H3090 Shorewood or equivalent.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
5. The Contractor shall be obliged to perform the contract on the terms and conditions described in the model contract constituting Annex 5 to the SWZ.
6. The Contracting Authority does not provide for the exercise of the option right.
7. The contracting authority does not require the contractor to perform key tasks personally.
8. The Contractor may entrust the performance of part of the contract to a subcontractor. In such a case, the Contracting Authority requests the contractor to indicate, in the tender, the part of the contract that it intends to entrust to subcontractors and the names of any subcontractors, if they are already known.
Furniture in the lobby in front of the gatehouse Student House No. 131. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend. During installation, all floors, walls, corridors, staircases, doors and elevators that will be used must be protected by the Contractor against damage. All damage caused during the assembly of furniture, as well as packaging materials (pallets, cardboard boxes, foils, tapes, polystyrene, etc.)
The Contractor shall remove on his own.
2. The dimensions quoted by the Contracting Authority must be checked before commencing the implementation (indicated on-site inspection before submitting the offer). The contractor is responsible for matching the furniture to individual rooms, inventoried by himself, on his own (with
particular attention to all sub-strings and installations existing in the building). The dimensions of the rooms in which the furniture has been designed may change due to renovation and construction works carried out in them. In the case of significant dimensional differences, any changes should be made
consult with the Ordering Party.
3. The given chipboard decors are subject to change. For valuation take the décor in the color of the board U708 ST9 Grey Light, W908 ST2 White Platinum, U702 ST9 Cashmere, Kaisersberg Oak H3349, Nebraska Oak H3331, H3090 Shorewood or equivalent.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
5. The Contractor shall be obliged to perform the contract on the terms and conditions described in the model contract constituting Annex 5 to the SWZ.
6. The Contracting Authority does not provide for the exercise of the option right.
7. The contracting authority does not require the contractor to perform key tasks personally.
8. The Contractor may entrust the performance of part of the contract to a subcontractor. In such a case, the Contracting Authority requests the contractor to indicate, in the tender, the part of the contract that it intends to entrust to subcontractors and the names of any subcontractors, if they are already known.
Concierge furniture Student dormitory No. 131. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend. During installation, all floors, walls, corridors, staircases, doors and elevators that will be used must be protected by the Contractor against damage. All damage caused during the assembly of furniture, as well as packaging materials (pallets, cardboard boxes, foils, tapes, polystyrene, etc.)
The Contractor shall remove on his own.
2. The dimensions quoted by the Contracting Authority must be checked before commencing the implementation (indicated on-site inspection before submitting the offer). The contractor is responsible for matching the furniture to individual rooms, inventoried by himself, on his own (with
particular attention to all sub-strings and installations existing in the building). The dimensions of the rooms in which the furniture has been designed may change due to renovation and construction works carried out in them. In the case of significant dimensional differences, any changes should be made
consult with the Ordering Party.
3. The given chipboard decors are subject to change. For valuation take the décor in the color of the board U708 ST9 Grey Light, W908 ST2 White Platinum, U702 ST9 Cashmere, Kaisersberg Oak H3349, Nebraska Oak H3331, H3090 Shorewood or equivalent.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
5. The Contractor shall be obliged to perform the contract on the terms and conditions described in the model contract constituting Annex 5 to the SWZ.
6. The Contracting Authority does not provide for the exercise of the option right.
7. The contracting authority does not require the contractor to perform key tasks personally.
8. The Contractor may entrust the performance of part of the contract to a subcontractor. In such a case, the Contracting Authority requests the contractor to indicate, in the tender, the part of the contract that it intends to entrust to subcontractors and the names of any subcontractors, if they are already known.
Furniture, room 2/20, Student House No. 131. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend. During installation, all floors, walls, corridors, staircases, doors and elevators that will be used must be protected by the Contractor against damage. All damage caused during the assembly of furniture, as well as packaging materials (pallets, cardboard boxes, foils, tapes, polystyrene, etc.)
The Contractor shall remove on his own.
2. The dimensions quoted by the Contracting Authority must be checked before commencing the implementation (indicated on-site inspection before submitting the offer). The contractor is responsible for matching the furniture to individual rooms, inventoried by himself, on his own (with
particular attention to all sub-strings and installations existing in the building). The dimensions of the rooms in which the furniture has been designed may change due to renovation and construction works carried out in them. In the case of significant dimensional differences, any changes should be made
consult with the Ordering Party.
3. The given chipboard decors are subject to change. For valuation take the décor in the color of the board U708 ST9 Grey Light, W908 ST2 White Platinum, U702 ST9 Cashmere, Kaisersberg Oak H3349, Nebraska Oak H3331, H3090 Shorewood or equivalent.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
5. The Contractor shall be obliged to perform the contract on the terms and conditions described in the model contract constituting Annex 5 to the SWZ.
6. The Contracting Authority does not provide for the exercise of the option right.
7. The contracting authority does not require the contractor to perform key tasks personally.
8. The Contractor may entrust the performance of part of the contract to a subcontractor. In such a case, the Contracting Authority requests the contractor to indicate, in the tender, the part of the contract that it intends to entrust to subcontractors and the names of any subcontractors, if they are already known.
Additional furniture Student House No. 131. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend. During installation, all floors, walls, corridors, staircases, doors and elevators that will be used must be protected by the Contractor against damage. All damage caused during the assembly of furniture, as well as packaging materials (pallets, cardboard boxes, foils, tapes, polystyrene, etc.)
The Contractor shall remove on his own.
2. The dimensions quoted by the Contracting Authority must be checked before commencing the implementation (indicated on-site inspection before submitting the offer). The contractor is responsible for matching the furniture to individual rooms, inventoried by himself, on his own (with
particular attention to all sub-strings and installations existing in the building). The dimensions of the rooms in which the furniture has been designed may change due to renovation and construction works carried out in them. In the case of significant dimensional differences, any changes should be made
consult with the Ordering Party.
3. The given chipboard decors are subject to change. For valuation take the décor in the color of the board U708 ST9 Grey Light, W908 ST2 White Platinum, U702 ST9 Cashmere, Kaisersberg Oak H3349, Nebraska Oak H3331, H3090 Shorewood or equivalent.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
5. The Contractor shall be obliged to perform the contract on the terms and conditions described in the model contract constituting Annex 5 to the SWZ.
6. The Contracting Authority does not provide for the exercise of the option right.
7. The contracting authority does not require the contractor to perform key tasks personally.
8. The Contractor may entrust the performance of part of the contract to a subcontractor. In such a case, the Contracting Authority requests the contractor to indicate, in the tender, the part of the contract that it intends to entrust to subcontractors and the names of any subcontractors, if they are already known.
Additional furniture Student House No. 21. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend. During installation, all floors, walls, corridors, staircases, doors and elevators that will be used must be protected by the Contractor against damage. All damage caused during the assembly of furniture, as well as packaging materials (pallets, cardboard boxes, foils, tapes, polystyrene, etc.)
The Contractor shall remove on his own.
2. The dimensions quoted by the Contracting Authority must be checked before commencing the implementation (indicated on-site inspection before submitting the offer). The contractor is responsible for matching the furniture to individual rooms, inventoried by himself, on his own (with
particular attention to all sub-strings and installations existing in the building). The dimensions of the rooms in which the furniture has been designed may change due to renovation and construction works carried out in them. In the case of significant dimensional differences, any changes should be made
consult with the Ordering Party.
3. The given chipboard decors are subject to change. For valuation take the décor in the color of the board U708 ST9 Grey Light, W908 ST2 White Platinum, U702 ST9 Cashmere, Kaisersberg Oak H3349, Nebraska Oak H3331, H3090 Shorewood or equivalent.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
5. The Contractor shall be obliged to perform the contract on the terms and conditions described in the model contract constituting Annex 5 to the SWZ.
6. The Contracting Authority does not provide for the exercise of the option right.
7. The contracting authority does not require the contractor to perform key tasks personally.
8. The Contractor may entrust the performance of part of the contract to a subcontractor. In such a case, the Contracting Authority requests the contractor to indicate, in the tender, the part of the contract that it intends to entrust to subcontractors and the names of any subcontractors, if they are already known.
Additional furniture of Gdańsk University of Technology1. The order includes the manufacture of furniture and hoisting systems for kitchen rooms 2/18, 3/18, 4/13, their delivery, bringing and assembly with connection to existing installations. Furniture should be leveled and in case of instability fix to the wall, hanging cabinets
suspend. During installation, all floors, walls, corridors, staircases, doors and elevators that will be used must be protected by the Contractor against damage. All damage caused during the assembly of furniture, as well as packaging materials (pallets, cardboard boxes, foils, tapes, polystyrene, etc.)
The Contractor shall remove on his own.
2. The dimensions quoted by the Contracting Authority must be checked before commencing the implementation (indicated on-site inspection before submitting the offer). The contractor is responsible for matching the furniture to individual rooms, inventoried by himself, on his own (with
particular attention to all sub-strings and installations existing in the building). The dimensions of the rooms in which the furniture has been designed may change due to renovation and construction works carried out in them. In the case of significant dimensional differences, any changes should be made
consult with the Ordering Party.
3. The given chipboard decors are subject to change. For valuation take the décor in the color of the board U708 ST9 Grey Light, W908 ST2 White Platinum, U702 ST9 Cashmere, Kaisersberg Oak H3349, Nebraska Oak H3331, H3090 Shorewood or equivalent.
4. The description of the subject of the contract is included in Annex 4 to the SWZ.
5. The Contractor shall be obliged to perform the contract on the terms and conditions described in the model contract constituting Annex 5 to the SWZ.
6. The Contracting Authority does not provide for the exercise of the option right.
7. The contracting authority does not require the contractor to perform key tasks personally.
8. The Contractor may entrust the performance of part of the contract to a subcontractor. In such a case, the Contracting Authority requests the contractor to indicate, in the tender, the part of the contract that it intends to entrust to subcontractors and the names of any subcontractors, if they are already known.