Engineering, production, transport, assembly, commissioning, training and documentation are announced for:
- A complete vacuum air condenser
- A complete overpressure_air condenser
- ancillary facilities
The subject matter of this tender — awarding unit (VE) 3.5 — is planning and construction work for the installation and commissioning of two air condensers including ancillary systems, consisting of a vacuum air condenser including an exhaust steam line, hot well and recooler, an overpressure air condenser including exhaust steam line, condensate container and Condensate pumps for both air condensers, an evacuation system as well as technological steel construction, electrical, control, measurement and regulation technology (ESMR) and loose flow technology. The air condensers are connected downstream of two steam turbines; in particular, the overpressure air condenser is connected downstream of a back-pressure steam turbine and the negative-pressure air condenser is connected downstream of a condensation steam turbine.