Sports hall construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 June 2023
Closing Date:
17 July 2023
Location(s):
DE115 Ludwigsburg (DE Germany/DEUTSCHLAND)
Description:
New sports hall Oscar Paret school

In the course of the restructuring of the town centre, the city of Freiberg am Neckar intends to build the new

Oscar-Paret-Schule (OPS 1st construction phase already completed. ) and a three-field sports hall with adjoining

Sports areas (2nd construction phase).

By lowering the sports hall by one storey, the level access to the foyer and

of the grandstand system from the urban space as well as a continuous equipment room. In addition, the

Sports hall in the urban space as a transparent sports and event hall.

The spacious foyer of the sports hall is accessed from the market square, a separate athletes' entrance is the

School square facing the school. Via an additional staircase, the gymnastics room and the outdoor sports areas are accessible from the

Changing rooms in the basement available.

VE 358-200 Tile work

Type and scope of the service:

Tiles:

• 590 m² composite waterproofing (synthetic resin base) with preparatory work, joint sealing tapes, pipe penetrations

• 770 m² wall tile format 300 x 600 mm (colors: black, gray) with work on sinks, toilets, urinals, etc.

• 175 m² floor tile format 150 x 150 mm R10 (colours: black, grey)

• 230 m² floor tile format 150 x 150 mm R11 (colors: black, gray)

• 170 m Sockelfliesen 150 x 150 mm

• 33 m Bodenrinnen anarbeiten

• 14 pcs of floor drains

• 1,035 m of elastic grouting work

• 19 pcs wall mirror format 0.6 x 1.5 m

• 4 pcs wall mirror format 0.6 x 1.2 m

Concrete stone:

• 500 m² cast stone format 600 x 600 mm (colour: granite grey) with preparatory work, cleaning and maintenance work

• 21 pcs angle steps with width 1800 mm (staircase A)

• 21 pcs angle steps with width 2000 mm (staircase B)

• 16 pcs angle steps with different widths from 2000 to 2130 mm for grandstand

• 58 St Stufenmarkierungen an Winkelstufen

• 500 m² protective cover for cast stone (painter's fleece and hardboard)

Walk-off mats:

• 1 x clean-off mat approx. 12.4 m² (size approx. 2.20 x 5.40 m)

• 1 piece Saubelraufmatte approx. 5.1 m² (size approx. 1.70 x 2.50 m)

• 1 x clean-off mat approx. 3.6 m² (size approx. 2.00 x 1.85 m)

Download full details as .pdf
The Buyer:
Stadt Freiberg a.N. - Neubau OPS
CPV Code(s):
45212225 - Sports hall construction work