The contractor must be responsible for laying the connection pipes on the public and private domain up to the primary connection flanges of the delivery station (IWAS) and installing the delivery station in accordance with the guidelines described in the specifications. In addition to delivery stations, the contractor will also be responsible for laying the connection pipes on the public and private domain up to the connection bracket, placing the heat meter's calculation unit and mounting the delivery set on the connection bracket in accordance with the guidelines described in the specifications.
This file will consist of two lots:
1. connections with delivery stations;
2. connections with delivery sets.
Lot 1: connections with delivery stationsLot 1: connection with delivery stations.
The contractor must be responsible for laying the connection pipes on the public and private domain up to the primary connection flanges of the delivery station (IWAS) and installing the delivery station in accordance with the guidelines described in the specifications.
Lot 2: connections with delivery setsLot 2: connection with delivery sets.
The contractor must be responsible for laying the connection pipes on the public and private domain up to the connection bracket, installing the heat meter's calculation unit and mounting the delivery set on the connection bracket in accordance with the guidelines described in the specifications.