Fire protection painting of the ceiling structure in the atrium main dimensions:
- Approximately 340 m² protection measure
- Priming approximately 320 m² steel surfaces
- Approximately 80 m² carrier fire-resistant
- Approximately 274 m² pipe profiles fire-resistant
- Approximately 320 m² top coat
- Required cleaning and ancillary work
See II.1.4