The subject of this EU announcement is the metalwork facade trade for phase II of the construction project Conversion & renovation of the existing therapy and well-being center in D-08648 Bad Brambach. The other trades will be published in separate announcements.
Type and scope of the service:
- dismantling facade cladding 18 m²
- Disassembly of facade elements escape doors w/h = approx. 1,635/3,050 mm 2 pcs
- dismantling facade elements window elements w/h = approx. 635/2,900 mm 3 pcs
- Disassembly of the facade element window element w/h = approx. 635/2,900 mm including pre-installed fire protection wall made of GK 1 piece
- F30 facade elements with T30-RS escape doors b/h = approx. 1,635/3,050 mm, including interior and exterior reveal 2 pieces
- F30 facade elements as fixed-glazed exterior window element, b/h = approx. 635/ 2,900 mm, including interior and exterior reveal 3 pcs
- F30 facade elements as fixed-glazed interior window element, b/h = approx. 635/2,900 mm, RW, R 45 dB, including interior and exterior reveal 1 piece
- Replacement mullion-transom facade b/h = approx. 5700/ 470 mm with F30 requirement 1 pc
- Room closure by F90 panel, 30 cm wide, 4 m
- Foiling exterior windows 14 m²
- Retrofit or upgrade opening restrictors 35 pcs
- Information desk outside the main entrance 1 hour
- Sun protection systems w/ h = approx. 169-301/208 — 345 cm 39 pcs
Particularities:
Special measures for construction work in the healing spring reserve (medicinal water protection zones II) are
required. Vehicles, machines and equipment are to be operated on biofuel. hydraulic drives
, where technically possible, must be converted to bio-hydraulic oil.