Project and design preparation, estimation of costs | Tenderlake

Project and design preparation, estimation of costs

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
10 April 2020
Closing Date:
19 May 2020
Location(s):
PL POLSKA (PL Poland/POLSKA)
Description:
Development of design documentation for the reconstruction of the DN500 gas pipeline between Tworzeń and Tworóg, threads I and II, section from ZZU Babia Ława to the Tworzeń junction in Dąbrowa Górnicza

Development of design documentation for the reconstruction of the DN500 gas pipeline between Tworzeń and Tworóg, threads I and II, section from ZZU Babia Ława to the Tworzeń junction in Dąbrowa Górnicza

Development of design documentation for the reconstruction of the DN500 gas pipeline between Tworzeń and Tworóg, threads I and II, section from ZZU Babia Ława to the Tworzeń junction in Dąbrowa Górnicza

Download full details as .pdf
The Buyer:
Operator Gazociągów Przesyłowych Gaz-System S.A., ul. Mszczonowska 4, 02-337 Warszawa; Operator Gazociągów Przesyłowych Gaz-System S.A. Oddział w Świerklanach
CPV Code(s):
71242000 - Project and design preparation, estimation of costs