Due to its useful life, the existing school building is in a condition that requires extensive repair. It is planned to leave the supporting structure in place. Reference is made to the feasibility study regarding the remediation measures.
The space requirements of the renovated school are being met in accordance with the currently changed G9 space program for grammar schools and is included in the feasibility study. It attaches great importance to economic and energy-efficient planning.
The appearance of the school building must be adapted to the sports hall, which was renovated in 2018. The renovation measure is to be implemented in a construction phase. For this purpose, it is necessary that the school operation is completely set up in a
container school is outsourced. For this purpose, the architectural services according to §§ 33 et seq. HOAI 2021 are to be awarded for service phases 1 to 9.
Due to its useful life, the existing school building is in a condition that requires extensive repair. It is planned to leave the supporting structure in place. Reference is made to the feasibility study regarding the remediation measures. The space requirements of the renovated school are being met in accordance with the currently changed G9 space program for grammar schools and is included in the feasibility study. It attaches great importance to economic and energy-efficient planning. The appearance of the school building must be adapted to the sports hall renovated in 2018
be. The renovation measure is to be implemented in a construction phase. For this purpose, it is necessary that school operations are completely outsourced to a container school to be built on outdoor sports facilities.
For this purpose, the architectural services according to §§ 33 et seq. HOAI 2021 are to be awarded for service phases 1 to 9.