Pipeline-inspection services | Tenderlake

Pipeline-inspection services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 February 2021
Closing Date:
04 March 2021
Location(s):
ES ESPAÑA (ES Spain/ESPAÑA)
Description:
In-service inspection of the Enagás gas pipeline network [In-Line Inspection (ILI) Services of Enagás' Gas Pipeline Network]

Enagás plans to carry out ILI inspections of eight to ten gas pipelines of different diameters each year (600-750 km / year). The technology to be used is MFL + caliper + IMU, the tools must have ATEX certificate. The service will include the pre-races of the calibrated plate piston and piston cleaning, mobilization and demobilization, transport on site, as well as cleaning of tools. Each ILI inspection will take place in one week.

Enagás plans to carry out ILI inspections of eight to ten gas pipelines of different diameters each year (600-750 km / year). The technology to be used is MFL + caliper + IMU, the tools must have ATEX certificate. The service will include the pre-races of the calibrated plate piston and piston cleaning, mobilization and demobilization, transport on site, as well as cleaning of tools. Each ILI inspection will take place in one week.

Download full details as .pdf
The Buyer:
Enagás Transporte, S. A. U.
CPV Code(s):
76600000 - Pipeline-inspection services