Sports floor construction in a newly built sports hall on two levels
- approx. 2,000 m2 underfloor heating, for elastic sports floors
- approx. 2,000 m2 elastic sports flooring, linoleum top covering
- approx. 250 m2 sports floor rigid construction, top covering linoleum
- approx. 40 m2 linoleum on site screed, including preparatory work