Construction work for power plant | Tenderlake

Construction work for power plant

Contract Value:
EUR 8M - 8M
Notice Type:
Contract Notice
Published Date:
18 April 2023
Closing Date:
18 May 2023
Location(s):
PT300 Região Autónoma da Madeira (PT PORTUGAL)
Description:
Construction Contract for the Synchronous Wood Compensator

Construction of a synchronous compensator to be integrated into the electrical system of the island of Madeira, tending to increase the short-circuit power, increase of natural inertia and for voltage regulation, in production scenarios with a lot of renewable energy.

Construction of a synchronous compensator to be integrated into the electrical system of the island of Madeira, tending to increase the short-circuit power, increase of natural inertia and for voltage regulation, in production scenarios with a lot of renewable energy.

Download full details as .pdf
The Buyer:
EEM - Empresa de Electricidade da Madeira, S. A.
CPV Code(s):
45251100 - Construction work for power plant