Roof waterproofing and roof greening work on on-site roof construction with roof formwork and vapor barrier. Gable roof in north/south orientation - roof pitch 17° - 22°
3 diaphragm gables with asymmetrical roof pitch on the east side of the building - roof pitch 17° + 47°
158 m Attic construction in timber panel construction, height 44 - 70 cm
805 m2 roof waterproofing, bitumen membranes 2lg., thermal insulation PUR, thickness 14cm
5 parapet drains DN 100 as main and emergency drains
4 Attila drains DN 100/DN 50 as main emergency combined drainage
78 m downspout DN 100, steel, hot-dip galvanized
52 m downspout DN 50, steel, hot-dip galvanized
5 pieces of roof anchors as a single anchor point
72 m fall protection - lifeline system
12 pieces of roof ventilation and cable entry elements DN 100
6 compartment roof windows 90 x 90 cm
8 flat roof windows 90 x 145 cm
1 piece flat roof window as SHEV 140 x 140 cm
1 piece flat roof window as SHEV 120 x 120 cm
695 m2 extensive green roof with sedu mats, shear protection, roof pitch 17°-22°
60 m2 extensive green roof with sedu mats, shear protection, roof pitch 45°-47°
8 m3 gravel fill, grain size 16/32, for gravel surface, thickness 60-70 mm