— preparatory work such as protective measures, break off asphalt, plasting/granite stone/edge/gutters and trees/tree stums/roots remove preparation of the substrate;
— paving (granite paving, concrete slabs), asphalt work, edging and drainage;
planting and lawn work;
— bike rack including foundation, move boulders, supply and set up concrete seat cubes, install floor sleeves for parasols.
— preparatory work such as protective measures, break off asphalt, plasting/granite stone/edge/gutters and trees/tree stums/roots remove preparation of the substrate;
— paving (granite paving, concrete slabs), asphalt work, edging and drainage;
planting and lawn work;
— bike rack including foundation, move boulders, supply and set up concrete seat cubes, install floor sleeves for parasols.