Technical equipment planning (LPH 1-9 HOAI)
Anlagengruppen 1, 2, 3engineering services
Technical planning for technical equipment in accordance with Part 4 Section 2 of the HOAI 2021
The 1: Anlagengruppen 1, 2, 3
Service phases 1 to 9 HOAI (95% of the basic services)
Gradual assignment:
Stufe 1 (LPH 1-2 HOAI)
Stufe 2 (LPH 3-4 HOAI)
Stufe 3 (LPH 5-7 HOAI)
Stufe 4 (LPH 8-9 HOAI)
Honorarzone II in allen Anlagengruppen
KG 300 according to cost estimate: approx. EUR 1.63 million (gross)
KG 400 according to cost estimate: approx. EUR 0.85 million (gross)
The planning objectives presented below were developed on the basis of the analysis of the existing situation and the discussions with the representatives of the city of Rödental. Concretize through the successful application for the federal government's SJK 2022 funding program
various requirements, especially in the energy sector, are based on the
Funding guidelines. The requirements for sustainability are added to this.
The primary planning objective is to ensure the long-term operation of the cultural and
Sports hall for school and club sports as well as for cultural events of the
Municipality and local associations at municipal and regional level. Thereby
The focus is on the technical and energy-efficient refurbishment of the building and the updating of the space programme on the basis of the changed requirements.
For the fulfillment of the funding goals of the federal government's SJK 2022 funding program, the
Achievement of efficiency building level 70 required. In addition, for the purposes of the
Resilience in the conceptual approach to the remediation task
Requirement 2.5 "Natural hazards on site" according to the Quality Seal Manual
Sustainable Building (QNG) - Appendix 3 for the QNG PLUS standard. With regard to the special features of climate- and resource-saving construction, requirement 2.2 "Sustainable material extraction" according to the Handbook of the Quality Seal for Sustainable Buildings (QNG) - Annex 3 must be complied with at least in the QNG PLUS standard.
As in the original concept from the 60s of the
20th century, creatively with the neighboring school as an ensemble.
The installation of a photovoltaic system as a municipal contribution to the energy transition and decentralised energy supply is desired by the city of Rödental and is to be realised. For events in the cultural field, catering is often offered by the organizing associations. The necessary facilities are required for serving and serving food.
The necessary basic investigation and preliminary planning was carried out by the architectural firm wutke & hanisch from Coburg. The documents prepared are part of the tender documents.
For the measure described, a construction period of approx. 16 months can be assumed. The preparatory planning period from work phase 3 onwards should not be less than 8 months. With the necessary award procedure and a buffer period between completion and actual re-entry, a
Total project time of approx. 28 months, i.e. a little over 2 years.
Project run from the award of the planning services
Approval planning after approx. 3 months
Start of the award phase after approx. 7 months
Start of construction after approx. 11 months
Completion after approx. 27 months
Commissioning after approx. 28 months
A more precise scheduling of the start of construction and the processes as well as the
The expected end date is only possible after the design has been planned and the
Clarification of all further framework conditions possible.
Anlagengruppen 4, 5, 8engineering services
Technical planning for technical equipment in accordance with Part 4 Section 2 of the HOAI 2021
The 2: Anlagengruppen 4, 5, 8
Service phases 1 to 9 HOAI (95% of the basic services)
Gradual assignment:
Stufe 1 (LPH 1-2 HOAI)
Stufe 2 (LPH 3-4 HOAI)
Stufe 3 (LPH 5-7 HOAI)
Stufe 4 (LPH 8-9 HOAI)
Honorarzone II in allen Anlagengruppen
KG 300 according to cost estimate: approx. EUR 1.63 million (gross)
KG 400 according to cost estimate: approx. EUR 0.85 million (gross)
The planning objectives presented below were developed on the basis of the analysis of the existing situation and the discussions with the representatives of the city of Rödental. Concretize through the successful application for the federal government's SJK 2022 funding program
various requirements, especially in the energy sector, are based on the
Funding guidelines. The requirements for sustainability are added to this.
The primary planning objective is to ensure the long-term operation of the cultural and
Sports hall for school and club sports as well as for cultural events of the
Municipality and local associations at municipal and regional level. Thereby
The focus is on the technical and energy-efficient refurbishment of the building and the updating of the space programme on the basis of the changed requirements.
For the fulfillment of the funding goals of the federal government's SJK 2022 funding program, the
Achievement of efficiency building level 70 required. In addition, for the purposes of the
Resilience in the conceptual approach to the remediation task
Requirement 2.5 "Natural hazards on site" according to the Quality Seal Manual
Sustainable Building (QNG) - Appendix 3 for the QNG PLUS standard. With regard to the special features of climate- and resource-saving construction, requirement 2.2 "Sustainable material extraction" according to the Handbook of the Quality Seal for Sustainable Buildings (QNG) - Annex 3 must be complied with at least in the QNG PLUS standard.
As in the original concept from the 60s of the
20th century, creatively with the neighboring school as an ensemble.
The installation of a photovoltaic system as a municipal contribution to the energy transition and decentralised energy supply is desired by the city of Rödental and is to be realised. For events in the cultural field, catering is often offered by the organizing associations. The necessary facilities are required for serving and serving food.
The necessary basic investigation and preliminary planning was carried out by the architectural firm wutke & hanisch from Coburg. The documents prepared are part of the tender documents.
For the measure described, a construction period of approx. 16 months can be assumed. The preparatory planning period from work phase 3 onwards should not be less than 8 months. With the necessary award procedure and a buffer period between completion and actual re-entry, a
Total project time of approx. 28 months, i.e. a little over 2 years.
Project run from the award of the planning services
Approval planning after approx. 3 months
Start of the award phase after approx. 7 months
Start of construction after approx. 11 months
Completion after approx. 27 months
Commissioning after approx. 28 months
A more precise scheduling of the start of construction and the processes as well as the
The expected end date is only possible after the design has been planned and the
Clarification of all further framework conditions possible.