Completion of the restructuring works and extension of the half-board of the Marcelin Berthelot high school in Saint Maur des Fosses (94)
The Operation aims to completely restructure the half-board premises as well as the adjoining engineering science rooms, adapting the future premises to the reference surfaces. It also includes the repatriation of the cafeteria to its own in the main building. The technical and architectural details of the operation are specified in the Project Presentation Notice attached to these consultation regulations.