Generating sets | Tenderlake

Generating sets

Contract Value:
EUR 2M - 2M
Notice Type:
Contract Notice
Published Date:
20 October 2023
Closing Date:
23 November 2023
Location(s):
FRL PROVENCE-ALPES-CÔTE D’AZUR (FR FRANCE)
FRL04 Bouches-du-Rhône (FR FRANCE)
Description:
Rental of mobile emergency equipment at CEA Cadarache

Framework agreement on the rental of mobile emergency equipment at CEA Cadarache. These services are carried out on behalf of the Technical and Logistics Service (STL)/Maintenance Management Group (G2M) of CEA Cadarache.

The framework agreement is multi-awardee on subsequent contracts.

The framework agreement is capped at a maximum amount of €1,700,000 excluding VAT.

In particular, the services include:

- Provision of mobile emergency sources 7 days a week and 24 hours a day

- The availability of a call center 7 days a week, 24 hours a day

- Transport of mobile emergency means to the installations

- Provision of rented mobile emergency equipment and their connection accessories

- The handling and cushioning equipment required for the installation and removal of the rented mobile emergency equipment

- Connections of accessories to mobile means (connections to the end customer's installation remain the responsibility of the CEA)

- Inspections, commissioning and shutdown of mobile emergency means

- Preventive and corrective maintenance of mobile emergency means

- Continuity of service (if necessary, replacement with iso-functionality and connections)

- Carrying out regulatory controls,

- The provision of technical files for leased mobile equipment, written in French: technical sheets, electrical-hydraulic drawings, operating instructions, certificates of conformity, regulatory control reports, up-to-date maintenance logs, etc.

- Drafting of supporting documents (operating procedures, prevention plan, reports, etc.)

- Taking care of the formalities of access to the site

The estimated quantities in number of days for 4 years are as follows by type of device:

Mobile Generator Sets:

Power/number of rentals per year/ number of rental days per year

≤ 20kVA/ 1 /30

20kVA < Eqt ≤ 40 kVA/ 1/ 30

40kVA < Eqt ≤ 70 kVA/ 1/ 30

100 kVA/ 1/ 60

125 kVA/ 1/ 365

150 kVA/ 1/ 60

200 kVA/ 2/ 120

250 kVA/ 2/ 730

300 kVA/ 2/ 485

400 kVA/ 2/ 730

500 kVA/ 1/ 365

800 kVA/ 1/ 60

1050 kVA/1/ 60

That's 3125 rental days per year and 12500 days for 4 years.

Chillers:

Power/number of rentals per year/ number of rental days per year

40 kW/1/ 60

100 kW/2/ 240

150 kW/2/ 240

250 kW/2/ 240

400 kW/1/ 120

600 kW/1/ 120

That is 1020 days of rental per year and 4080 days for 4 years.

Heat pump:

Power/number of rentals per year/ number of rental days per year

15 kW/1/ 150

30 kW/1/ 150

60 kW/1/ 150

120 kW/1/ 150

180 kW/1/ 150

That is 750 days of rental per year and 3000 days for 4 years.

The volume indicated is an estimate and does not constitute a commitment on the part of the CEA. The maximum amount of subsequent contracts invoiced throughout the duration of the framework agreement is set at EUR 1 700 000.00 excluding VAT.

Download full details as .pdf
The Buyer:
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
CPV Code(s):
31121000 - Generating sets