The object of the order is a comprehensive supply of electricity with a distribution service of up to 61 points of energy consumption (PPE) with a total estimated volume of 7,011 MWh with specified, according to applicable regulations, quality standards - Regulation of the Minister of Economy and Labour of 20 December 2004 on detailed conditions for the connection of operators to electricity networks, traffic and operation of networks, specifying, inter alia, technical parameters of electricity.
The quality standards of electricity are described in the Law of 10 April 1997 — Energy Law and in the Regulation of the Minister of Economy of 4 May 2007 on the detailed conditions of the operation of the electricity system.
The object of the order is a comprehensive supply of electricity with a distribution service of up to 61 points of energy consumption (PPE) with a total estimated volume of 7,011 MWh with specified, according to applicable regulations, quality standards - Regulation of the Minister of Economy and Labour of 20 December 2004 on detailed conditions for the connection of operators to electricity networks, traffic and operation of networks, specifying, inter alia, technical parameters of electricity.
The quality standards of electricity are described in the Law of 10 April 1997 — Energy Law and in the Regulation of the Minister of Economy of 4 May 2007 on the detailed conditions of the operation of the electricity system.
The sale of electricity and the provision of distribution services will be carried out under the conditions laid down in the Act of 10 April 1997. Energy Law (i.e., DZ.U. of 2021, item 716, as amended), the implementing provisions of this law, in particular the Ordinance of the Minister of Economy of On 4 May 2007 on the detailed conditions for the operation of the electricity system (DZ.U. 2007r No 93, item 623, as amended), generally applicable legal provisions and unit prices of active energy determined after the resolution of the procedure.
The summary of all energy consumption points with the indication of the location shows the connector number 3 to SWZ.
The Contracting Authority will have the right to notify a new electricity collection point, with an increase in the collection points only possible within the tariff groups which are included in the SWZ and priced in the Contractor's assortment form. The notification of the new PPE will come through an annex to the agreement.
The Municipal Water and Sewer Company Sp. z o.o. in Łomża is entered in the Register of Power Generators in the Small Installation and all the energy produced for its own needs.