The tendered services include the conversion and extension of the PWC plant Speckhorn FR Münster. The PWC plant Speckhorn is located on the BAB 43 at km 0 + 42 in the direction of travel Münster. The start of execution is planned for 2019.
- 1 new construction rainwater treatment plant,
- 1 dismantling and new construction of pneumatic station,
- approx. 1.6 km pressure pipeline DA90,
- about 15 000 m
- approx. 650 m canal laying (DN / OD 250, 315, 400),
- 165 m heavy-duty gutter,
- About 4 500 m
- about 12 000 m
- about 5 500 m
- about 5 500 m
- about 6 500 m
- approx. 620 m F30 shelves with slipform paver,
- about 850 m curbs,