Renewal and modernization of the Bühlot outdoor pool in Bühlertal:
After more than 50 years of operation, the outdoor swimming pool built in the 1960s is in need of major renovation and modernization.
The following measures are planned:
- Reduction of the water surface of the existing combination pool from approx. 1,500 square meters to 960 square meters,
- Dismantling of the existing functional building and replacement with a two-part new building with accommodation of the technical systems as well as the changing, sanitary and personnel areas,
- Complete renewal of the water treatment system and the associated piping as well as renewal of the sanitary, heat supply and electrical systems,
- Installation of a stainless steel combination pool in the existing concrete pool,
- complete renovation of the outdoor facilities,
- Installation of a wide wave slide and a new jumping facility (1 m, 3 m, 5 m).
Start of construction: March 1, 2021 Completion: April 15, 2022 Total construction costs (KG 200-600): approx. 5.6 million EUR net.
Technical building equipment for heating, ventilation, plumbing:
- Sanitary facilities, outdoor pool for changing rooms, toilets and showers including accessories,
- Sanitary facility with approx. 600 m VA pipe,
- Complete sewage and rainwater installation, changing and technical building,
- Hot water preparation through-flow system KTS and heating storage 850 L. Vacuum tube collector system 40 kW with electrical post-heating cartridge,
- Open double pump lifting system technology.
Service period:
Start of work around July 2021 with the start of structural work in sections
Completion of work around April 2022, commissioning and acceptance.