Engineering design services | Tenderlake

Engineering design services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 April 2023
Closing Date:
22 May 2023
Location(s):
FRD NORMANDIE (FR FRANCE)
Description:
Technical assistance mission to project management in the field of electrical engineering

mission of assistance to technical studies in electrical engineering to be provided to the National Service of Airport Engineering (Snia). The SNIA is prime contractor for the construction of a hangar and the renovation-extension of tertiary buildings on the Air Base 105 of Evreux-Fauville including:

- The construction of an aircraft maintenance hangar with its maintenance rooms and associated tertiary premises to accommodate 3 Falcon 8x and ensure their maintenance;

- The renovation of a tertiary building in changing rooms (building 428), and the rehabilitation and construction of an extension of a tertiary building (building 438) on behalf of the Airborne Electronic Squadron (Eea).

The contractor will assist the project manager during the phases of the operation. The market is divided into 5 technical parts:

- Technical part 1: Installations of the eea building 428 and 438

- ODA (final pre-project studies);

- Pro/Dce (project studies and technical documents in the companies' consultation file);

- Act (assistance in the award of works contracts);

- Visa/Det (visa of execution and synthesis studies and direction of execution of works;

- AOR/GPA (assistance in reception operations and during the period of guarantee of perfect completion).

- technical part 2: Maintenance hangar

- ODA (final pre-project studies);

- Pro/Dce (project studies and technical documents in the companies' consultation file);

- Act (assistance in the award of works contracts);

- Visa/Det (visa of execution and synthesis studies and direction of execution of works;

- AOR/GPA (assistance in reception operations and during the period of guarantee of perfect completion).

- technical part 3: Transformer station - y20

- ODA (final pre-project studies);

- Pro/Dce (project studies and technical documents in the companies' consultation file);

- Act (assistance in the award of works contracts);

- Visa/Det (visa of execution and synthesis studies and direction of execution of works;

- AOR/GPA (assistance in reception operations and during the period of guarantee of perfect completion).

- Technical part 4: Infrastructure networks

- ODA (final pre-project studies);

- Pro/Dce (project studies and technical documents in the companies' consultation file);

- Act (assistance in the award of works contracts);

- Visa/Det (visa of execution and synthesis studies and direction of execution of works;

- AOR/GPA (assistance in reception operations and during the period of guarantee of perfect completion).

- Technical part 5: Cybersecurity

- pOC Cyber

-formation

- data encryption

-piloting.

The technical parts are to be treated simultaneously.

the benefits are described in Article 3 of the CCTP.

The execution time for each phase starts from the date specified in the administrative order to start the execution of the phase.

Download full details as .pdf
The Buyer:
min.Défense-Dcsid-Snia
CPV Code(s):
71320000 - Engineering design services