This procedure includes the conclusion of a contract in order to ensure the supply and installation of equipment to reinforce the supply of electricity to vessels (OPS - Onshore Power Supply) and enable the loading of electric boats at the Service Port, including the restructuring of the existing power grid originating from the local Transformer Station (PT9).
This procedure includes the conclusion of a contract in order to ensure the supply and installation of equipment to reinforce the supply of electricity to vessels (OPS - Onshore Power Supply) and enable the loading of electric boats at the Service Port, including the restructuring of the existing power grid originating from the local Transformer Station (PT9).