New middle building and alterations to B1 and B2.
A middle building is to be constructed with 1 floor between building B1 and building B2. In addition B1 and B2 are to be altered. Concerns complete work including the technical professions.
The project will be carried out as a turnkey contract, i.e., engineering design services are included.
Otherwise see the drawings and descriptions.