Rheiner Landstraße, Osnabrück. Execution of civil engineering and surface works in the fields of sewer construction, road construction, electricity supply, gas supply and water supply.
Sewer construction: Conversion of the mixed water sewer to a separation system. Rainwater channel made of reinforced concrete pipes DN 1.600 and concrete pipes DN 1.000- 1.200, bottom depths between 3.5 m and 5.0 m. Dirty water channel made of PE-HD pipe Since 225 mm at a depth of 4.0 m to 5.5 m. Replacement of existing mixing water house connections through dirt and rainwater house connections. Execution of road works and works for the gas, water and electricity supply.
Overview of the main masses:
Approximately 770 m PE-HD pipes Since 225 mm
Approximately 770 m concrete pipes DN 400-1600 mm
Approximately 770 m groundwater lowering (vacuum system)
Approximately 8 500 m
Approximately 13 500 m
Approximately 6 600 m
Approximately 7 100 m
Approximately 1 600 m on-board and gutter system
Approximately 4 900 m cable tubes fiber optic supply
Approximately Lay 2 200 m of lighting cable
Approximately Set 50 pieces of lighting mast
Approximately Transfer 100 m of gas and drinking water pipeline
Approximately Create 6 pieces of gas and drinking water connections
Approximately Create 5 pcs of low voltage house connections