New building - special school with special educational focus on "mental development"
Fredersdorfer Chaussee 21, 15345 Altlandsberg
Lot 07 - Exterior windows and doors incl. sun protection
Essential construction work:
- Wood-aluminum windows approx. 104 pieces
- Wood-aluminum French doors approx. 7 pieces
- Connection sealing to the building approx. 1,200 running metres
- Aluminum windows approx. 3 pieces
- Plastic nest approx. 3 pieces
- Window sills, exterior, aluminium approx. 300 m
- Window sills, outside, wood approx. 300 m
- Timber mullion and transom façade approx. 470 m2
- Sealing of the connection to the building approx. 500 m
- Steel exterior doors approx. 10 pieces
- Venetian blind systems with cable guide approx. 140 pieces
- Venetian blind systems with rail guide approx. 21 pieces