The work to be carried out is located in the center of the city of Tilburg near the Paleisring, between the Schouwburg and the Katterug. The work to be carried out concerns the Paleisring and Schouwburgring section between the Katterug and Schouwburg, including the connection of the Bisschop Zwijsenstraat.
The work mainly consists of:
• Opruimingswerkzaamheden;
• grondwerkzaamheden;
• Rioleringswerkzaamheden;
• Verhardingswerkzaamheden;
• Performing additional work;
• Maintaining the works made.
For the sake of brevity, please refer to the Specifications and annexes thereto.
City Forum Phase 2, redevelopmentThe work mainly consists of:
• Opruimingswerkzaamheden;
• grondwerkzaamheden;
• Rioleringswerkzaamheden;
• Verhardingswerkzaamheden;
• Performing additional work;
• Maintaining the works made.
For the sake of brevity, please refer to the Specifications and annexes thereto.