Construction phase 3 - HDD measures
Laying of conduits for 110 kV cables in closed construction between the UW 93-Lärchenstraße and the UW 76-Südwest
NRM Netzdienste Rhein-Main GmbH (NRM) is planning to implement a 110 kV cable connection
from substation UW 93 Lärchenstraße to substation UW 76 Südwest – Griesheimer Stadtweg.
As part of the overall construction project, the installation will take place in construction phase 3 (BA 3)
a cable conduit route for a later insertion of 110 kV cables by means of directional drilling
- Horizontal Directional Drilling (HDD) on a total route length of 1020 m.