Underground work other than tunnels, shafts and subways | Tenderlake

Underground work other than tunnels, shafts and subways

Contract Value:
EUR 4M - 4M
Notice Type:
Contract Notice
Published Date:
20 October 2023
Closing Date:
20 November 2023
Location(s):
DE712 Frankfurt am Main, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
UW93-UW76: HDD measures for the rerouting of 110 kV cables

Construction phase 3 - HDD measures

Laying of conduits for 110 kV cables in closed construction between the UW 93-Lärchenstraße and the UW 76-Südwest

NRM Netzdienste Rhein-Main GmbH (NRM) is planning to implement a 110 kV cable connection

from substation UW 93 Lärchenstraße to substation UW 76 Südwest – Griesheimer Stadtweg.

As part of the overall construction project, the installation will take place in construction phase 3 (BA 3)

a cable conduit route for a later insertion of 110 kV cables by means of directional drilling

- Horizontal Directional Drilling (HDD) on a total route length of 1020 m.