Electrical engineering installation works | Tenderlake

Electrical engineering installation works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 June 2023
Closing Date:
21 August 2023
Location(s):
DE25A Neustadt a. d. Aisch-Bad Windsheim (DE Germany/DEUTSCHLAND)
Description:
General renovation of the district office of Neustadt a.d.Aisch - SLN-T02 electrical work (2-th)

undertakings

The district office Neustadt/Aisch – Bad Windsheim is to be renovated. At the same time, there is a shortage of land because the number of

In the course of ever new tasks, jobs have grown. The initial task was based on an ideal spatial programme.

to examine the maximum capacity in the portfolio, taking into account the functional relationships of the individual subject areas, in order to:

to find out which areas are not accommodated in the stock and therefore have to be cultivated. 7 different

Area distributions were investigated. Once the need for cultivation had been clarified, the task was to be examined in the following:

which places the building mass generated from the surfaces can be placed. For this purpose, 6 different arrangements were examined.

Two orders were deepened and presented to the district council with a cost estimate. For the remaining

Finally, the arrangement of the building mass was the energy standard and the construction method in different variants and

Combinations with each other and submitted to the district council for decision. (4 energy standards, 3 construction methods) The

The energy standard and the construction method were transferred to the further planning phases. The old building is built in its external form with

Perforated windows and larger façade parts remain largely the same in alternation. There will be a contemporary colorfulness of the windows

envisaged. With an ETICS for energetic upgrade, the plaster look is retained in structure and color.

Under the premises of a technical and organizational maintenance of the administrative operation in the existing building, the

Construction of component D as the first construction phase - which is the subject of this specification - the result. The completed

Construction phase 1 will then serve as a marshalling yard for the following further construction phases of the general renovation of the existing building, which will be carried out in the

will be the subject of further procurement procedures in the coming years.

location

The district office is centrally located in Neustadt/Aisch to the schools south of the old town centre. The marketplace is divided into ten

Minutes walking distance. A bus stop is located near the building.

NSHV with 7 fields1 piece

NH switch-disconnector with fuse size 00 3-pole26 pieces

Current measurement module with 8 measuring inputs20 pieces

Current transformer 100/5 A81 pcs

Current transformer 150/5 A18 pieces

Current transformer 200/5 A6 pieces

Current transformer 300/5 A6 pieces

NH switch-disconnector with fuse size 2 3pol3 pieces

Sub-distributor as floor distributor3 pieces

Miniature circuit breaker 10 A/B 1pol19 pieces

Miniature circuit breaker 10 A/C 1pol66 pieces

Miniature circuit breaker 16 A/B 1pol180 pieces

Residual current circuit breaker RCCB type A 40/0,03A 3pol+N42 pcs

Kabelrinne 200/60 mm47,5 m

Collection holder plastic1400 pieces

Collection holder as cable bracket2500 pieces

Collection holder steel300 pieces

Collection holder E30650 pieces

Floor boxes incl. equipment54 pieces

Underfloor electrical duct incl. connector112 m

Vertical manifold52 pieces

NYM-J 3x1,5 mm²ca. 6950 m

NYM-J 5x1,5 mm²ca. 3840 m

NYM-J 3x2,5 mm²ca. 8160 m

NYCWY 4x35/16 mm²approx. 250 m

NYCWY 4x50/25 mm²approx. 630 m

NHXH-J FE 3x1,5 mm² E30ca. 720 m

NHXH-J FE 5x16 mm² E30ca. 120 m

Flush-mounted junction boxes53 pieces

Device junction boxes in cavity walls121 pieces

Plug-in coupling 4-pin for blind motors87 pieces

Binary input device KNX-TP 2-fold13 pieces

Binary input device KNX-TP 4-fold53 pieces

EIB / KNX Datenbus-Kabelca. 750 m

LED recessed lights243 pieces

LED recessed luminaires71 pieces

LED recessed downlights44 pieces

LED damp-proof surface-mounted luminaire3 pieces

LED surface-mounted luminaires18 pieces

LED wall lamp exterior9 pieces

LED recessed ceiling downlight6 pieces

Fangleitung Blitzschutzca. 500 m

Manual call point for BMA10 pieces

Multiple sensor detector scattered light and heat principle for BMA96 pieces

Detector base with signal transmitter50 pieces

Acoustic signal transmitter for BMA63 pieces

J-Y(St)Y 2x2x0.8 mm red for BMAca. 1013 m

JE-H(St)H E30 2x2x0,8 mm red for BMAca. 538 m

A-2Y(L)2Y 2x2x0.8 mmca. 1485 m

19 inch data cabinet 2260/800/10001 pcs

19 inch patch panel 1 U20 piece

Duplex-Datenkabelca. 9382 m

Simplex-Datenkabelca. 1264 m

LWL-Universalkabel Multimode OM 5ca. 860 m

LWL-Universalkabel Singlemode OS 1ca. 860 m

Coaxial cable approx. 280 m

PV system 1 piece

Fire alarm control panel1 piece

E30 enclosure for BMZ1 piece

Emergency lighting control panel1 piece

Substation emergency lighting with 24 final circuits1 piece

Central battery system1 piece

Control unit for electric drive for smoke extraction2 pieces

Hand-held detector for smoke extraction4 pieces

Multi-sensor detector for smoke extraction2 pieces

Disabled call compact set2 pieces

Download full details as .pdf
The Buyer:
Landratsamt Neustadt a. d. Aisch
CPV Code(s):
09331200 - Solar photovoltaic modules
45311200 - Electrical fitting work
45312100 - Fire-alarm system installation work
45312310 - Lightning-protection works
45314000 - Installation of telecommunications equipment
45315100 - Electrical engineering installation works