"Modernization of the track and network system at the Zakład Usługowo Remontowy in Chorzów" – task No. 12, as part of the implementation of the Project entitled: "Integrated Project of modernization and development of tram infrastructure in the Silesian - Zagłębie Agglomeration along with the purchase of tram rolling stock - stage I" co-financed by the European Union from the Cohesion Fund under the Operational Program Infrastructure and Environment in the EU perspective 2014-2020.
1. The subject of the contract is the execution of construction works for the task entitled: "Modernization of the track and network system at the Zakład Usługowo Remontowy in Chorzów" – task No. 12, as part of the implementation of the Project entitled: "Integrated Project of modernization and development of tram infrastructure in the Silesian - Zagłębie Agglomeration along with the purchase of tram rolling stock - stage I" co-financed by the European Union from the Cohesion Fund under the Operational Program Infrastructure and Environment in the EU perspective 2014-2020.
2. General characteristics of the works:
1) Demolition works, i.e.:
-demolition of the track surface along with the substructure,
-removal and storage of debris from the demolition area with disposal,
-segregation of demolition materials (rails, sleepers, road materials),
-transport of materials from demolition,
-transport of steel scrap (from the entire range) and non-ferrous scrap to the ZUR warehouse in place,
-securing or reconstruction of collisions with underground infrastructure.
2) Reconstruction of the track, track and road system with a length of approx. 700 mtp, located on the premises of the Service and Repair Plant in Chorzów, including:
-reconstruction of tram tracks from 60R2 type rails with a gauge of 1435 mm using ballast and ballast-free technology,
-construction of the track structure in the system of integrated track and road surface,
-execution of the surface structure from recycled granite cubes,
-installation of the rail lubrication system (the exact location should be agreed with the Ordering Party immediately before assembly),
-installation of turnout heating system,
-turnout construction,
-construction of inter-track and intertrack connections,
-reconstruction of sidewalks,
-reconstruction of the road along the ZUR hall,
-reconstruction of power, return and control cables,
-reconstruction and construction of track drainage,
-reconstruction or securing of conflicting utilities networks,
-bringing the adjacent area to a proper condition, after the completion of works,
-introduction of temporary and target traffic organization,
-execution of as-built geodetic inventories along with marking in urban resources,
-grinding of rails after completion of track assembly works in accordance with the requirements of PKP instructions (ID 104 and ID 105).