The works associated with Lot 1 to 4 (but are not limited to) ; 1.Significant Temporary Traffic Management Design and Installation, 2.The construction of new sections of roads and footpaths, 3.installation of tactile and block paving, 4.installation of new drainage pipelines and gully pots, 5.manhole and chamber construction 6.raising/lowering/renewal of existing chamber and gully covers 7.installation of cycle lane separators & flexible bollards, 8.installation of retention sockets, sign polls and permanent signage, 9.installation of line marking, 10.other civil engineering works as required.