Architectural services for building extensions | Tenderlake

Architectural services for building extensions

Contract Value:
EUR 60K - 70K
Notice Type:
Contract award notice
Published Date:
06 April 2021
Closing Date:
Location(s):
IE IRELAND
Description:
Architectural Services for Additional Accommodation at Ballygarvan N.S. Co Cork 5

Please see attached project brief and schedule of additional accommodation

In summary, the project will comprise:

Section A:

• 5 SET Rooms: 15 m2 each

Giving a floor area including circulation and internal walls of: 96 m2.

Section B

• 2 classroom SEN Base 343.2 m2;

• Giving a floor area (incl circulation and internal walls) of 439 m2.

Giving a Gross Floor Area for Section A and B (including circulation, internal walls) of 535 m2.

Also:

• secure hard and soft play area 200 m2;

• sensory Garden 100 m2;

• 6 parking spaces;

• consultants are reminded to note especially that, as per the project brief, the design team will be required to explore all possibilities (including the options mentioned in the Brief) for providing the required accommodation on site.

Interim temporary accommodation

• Please note: In due course, the Design Team (DT) will be tasked with the provision of interim temporary accommodation (100 m2), additional accommodation.

Architectural Services for additional accommodation at Ballygarvan N.S. Co Cork. Ballygarvan N.S. is a primary school under the trusteeship of the Catholic Diocese of Cork and Ross.

Please see attached project brief and schedule of additional accommodation.

In summary, the project will comprise:

Section A:

• 5 SET rooms: 15 m2 each.

Giving a floor area including circulation and internal walls of: 96 m2.

Section B

• 2 classroom SEN Base 343.2 m2;

• giving a floor area (incl circulation and internal walls) of 439 m2.

Giving a Gross Floor Area for Section A and B (including circulation, internal walls) of 535 m2.

Also:

• secure hard and soft play area 200 m2;

• sensory garden 100 m2;

• 6 parking spaces.

• consultants are reminded to note especially that, as per the project brief, the design team will be required to explore all possibilities (including the options mentioned in the Brief) for providing the required accommodation on site while maximising the available play space on site.

Interim temporary accommodation.

• Please note: In due course, the Design Team (DT) will be tasked with the provision, on a rental basis, of interim temporary accommodation (100 m2), including all required statutory approvals and compliances, to be used by the school from August 2022 until such time that the permanent structure has been completed. The DT are to ensure that the location of the interim temporary accommodation will not impede the development of the permanent additional accommodation.

Awarded to:
Architectural Services for Additional Accommodation at Ballygarvan N.S. Co. Cork 5
Butler Cammoranesi, Cork (IE)
Download full details as .pdf
The Buyer:
Ballygarvan National School
CPV Code(s):
71200000 - Architectural and related services
71210000 - Advisory architectural services
71220000 - Architectural design services
71221000 - Architectural services for buildings
71223000 - Architectural services for building extensions