Salus, FK BBG, extension of the house Hoffmann, central Ergo + P4, roofing work
LB 020.1 Roofing and plumbing work.
Essential contents / course positions:
- approx. 110 m 2 Construction plywood, d = 24 mm, in different widths, component part: parapet and eaves,
- approx. 1 050 m 2 Weldable bitumen vapor barrier welding membrane,
- approx. 1 100 m 2 Thermal insulation, DAA dm, EPS 035, in different thicknesses,
- approx. 970 m 2 Slope insulation, DAA dm, EPS 035, i. M. 100 mm,
- approx. 1 050 m 2 1. Sealing layer, elastomer bitumen cold self-adhesive membrane, PYE-KTG-KSP-3.0,
- about 1,050 m 2 2. Sealing layer, polymer bitumen welding sheeting, PYE-PV 200 S5,
- approx. 160 m 2 3. Sealing layer, HT elastomer bitumen welding membrane, PYE-KTP-4.0 as an inspection passage,
- approx. 160 m parapet cover, titanium zinc, 1.0 mm, Z760 or Z925,
- approx. 35 m rain gutter, box-shaped, titanium zinc, NG 400,
- approx. 70 m rain downpipe DN 100 or DN 120,
- approx. 90 m 2 Demolition of rolling gravel, bitumen - sealing, 2-layer and the insulation of the flat roof,
- approx. 40 m 2 Demolition of bitumen shingle - sealing on wooden formwork of the gable roof in small areas,
- approx. 40 m 2 Glass fleece - bitumen shingles, rectangular shape including underlay in small areas,
- approx. 150 m fall protection, rope safety system with thermal insulation and weather protection hood,
- approx. 4 pieces of fall protection, individual attachment points with thermal insulation and weather protection hood,
- approx. 1.50 m 2 Chimney cladding, 4-sided, slate, rectangle - double roof.