With the implementation of the Bavarian State Garden Show 2025, the city of Furth im Wald is seizing the opportunity to
to strengthen important green and recreational structures in the city and to improve everyday life in the city
more attractive. The relationship to water is made more tangible as an important quality of location.
The central design element in the southern part of the garden show is the "Drachensteg", an approx. 950 m
long adventure trail through the Chambaue. The "Drachensteg" is a development that can be used by pedestrians,
which crosses several rivers, leads through a stream bed and circles an artificial pond. At
In some places, the Drachensteg forms widenings with a special quality of stay and
Seating.
The subject of this tender is the production of the steel substructure for the bridges
and footbridges.
The subject of this tender is the production of the steel substructures for the planned bridges
and footbridges.
The course essentially includes:
- Manufacture and supply of substructures for bridges 1, 2c, 4, 5, 6 and 7
- Manufacture and supply of girder structures for jetties 3, 4, 5-6, balcony loop and bank steps
- Application and laying of the large-format Stb panels as surface covering on steel substructure (production and delivery of the panels is carried out by another trade; not part of this specification)
A total of approx. 96.8 tonnes of steel as a bridge structure and approx. 55.3 tonnes of steel web structure including corrosion protection are to be supplied and mounted on existing foundations.
A total of approx. 1,303 m2 of large-format Stb slabs are to be laid on the steel substructure as a surface covering.