Heating works | Tenderlake

Heating works

Contract Value:
EUR 1M - 1M
Notice Type:
Contract Notice
Published Date:
12 January 2022
Closing Date:
24 January 2022
Location(s):
FRK1 Auvergne (FR FRANCE)
FRK26 Rhône (FR FRANCE)
Description:
Framework agreement relating to the hydraulic connection, production of the insulation and prior dismantling for the district heating substations operated by DALKIA on Issoire and the west of Lyon.

The purpose of this consultation is the realization, supply, installation, welding of piping parts and associated equipment allowing the hydraulic connection of skids (assemblies composed of heat exchangers, control valves with servomotors, meters and other associated hydraulic equipment), with realization of the heat insulation and the prior dismantling necessary, for the substations of the district heating utilities operated by DALKIA and its subsidiaries in Issoire and the west of the metropolis of Lyon.

Framework agreement relating to the hydraulic connection, production of the insulation and prior dismantling of district heating substations operated by ECLYDE in the west of the Lyon metropolitan area

Single-contract framework agreement with purchase orders for a period of (3) three years, renewable twice one year (1+1) relating to the realization, supply, installation, welding of pipes and associated equipment allowing the hydraulic connection of skids (assemblies consisting of heat exchangers, control valves with servomotors, meters and other associated hydraulic equipment), with the completion of the insulation and the necessary prior dismantling, for the substations of the district heating utilities operated by ECLYDE on the Western network of the Lyon metropolis. The number of connections is estimated at: - (35) thirty-five units approximately in summer 2022- (65) sixty-five units approximately between 2023 and 2026, depending on the signing of the subscription policies. Optionally, the Client will be able to provide certain equipment.The framework agreement is concluded without minimum and for a maximum value of 780,000 euros. It does not confer exclusivity on the holder as to the needs of the contracting entity.

Framework agreement relating to the hydraulic connection, production of the insulation and prior dismantling, for district heating substations operated by ENERG'ISS on the Issoire network

Single-contract framework agreement with purchase orders for a period of (3) three years, renewable twice one year (1+1) relating to the realization, supply, installation, welding of pipes and associated equipment allowing the hydraulic connection of skids (assemblies consisting of heat exchangers, control valves with servomotors, meters and other associated hydraulic equipment), with completion of the thermal insulation and the necessary prior dismantling, for the substations of the district heating utilities operated by ENERG'ISS in the commune of Issoire.The number of connections is estimated at: - (35) Thirty five units approximately in summer 2022- (11) Eleven units approximately between 2023 and 2026, depending on the signature of the subscription policies. Optionally, the Client will be able to provide certain equipment.The framework agreement is concluded without minimum and for a maximum value of 360 000 euros, It does not confer exclusivity to the holder on the needs of the contracting entity.

Download full details as .pdf
The Buyer:
DALKIA Centre Est
CPV Code(s):
09323000 - District heating
44161600 - Low-pressure pipeline
45111300 - Dismantling works
45232141 - Heating works