The component of the overall construction project is the construction phase of the telecommunications and information technology systems
The component of the overall construction project is the construction of the telecommunications and information technology systems (KG450)
KG 450 telecommunications and information technology systems
Component B/C/D
1 pc light call control panel
1 station ComStation/ BUS-C
9 pcs. room terminal Flamenco, without voice communication
10 pcs room signal light 2-piece, 3-piece
7 pcs. plug-in device with call button
7 pcs. pear button with two call buttons
2 call buttons
4 pcs. IP-Fixdome camera
2 pcs network cabinet 42 U, 19"
2 pcs cooling attachment 3.8 kW for network cabinet
1216 m Simplex Data Cable Cat7 to 1200 MHz (4 x 2 x 0.62 mm) (AWG22)
6600 m Duplex Data Cable Cat7 to 1200 MHz 2x(4 x 2 x 0.62 mm) (AWG22)
120 m fiber optic cable A/ I-DQ(ZN)BH 12 fibers OS2
375 m telecommunication installation cable J-Y(St)Y LG
275 m PVC-Mantelleitung NYM-J
160 Stk. Datenanschlussdose 2xRJ45 UP/ AP/ BR
40 Stk. Datenanschlussdose 1xRJ45 UP/ AP/ BR
50 pcs patch cord – Cat6A (IEC) 2xRJ45
16 pc patch cord – fiber optic duplex patch cable
2 pcs. antenna socket
100 m Koaxiales Hochfrequenzkabel
36 pcs. cable tray/ climbing path 100/ 200/ 300/ 400/ 500 mm width
45 m Leitungsführungskanäle 15x 15- 40x 40 mm
135 m plastic electrical installation pipes 25- 32 mm
3 mortar bulkheads up to 0.2 m²
10 pcs mineral wool plate bulkhead mortar bulkhead up to 0.3 m²
17 pcs. fire protection coatings cable bundles / single cables
42 holes Du = 25- 50 mm to 60-100 mm masonry / concrete
32 m slots up to 50x 30 mm (WxD) masonry / concrete