The assignment includes the establishment of an approximately 1,4 km long water and sewage pipe in Leira and trenches on land in both ends. In the south end, the trenches shall be completed on land, and in the north end the water pipes shall be connected to the existing booster station PV11 at Børke, while the sewage pipe shall be lead to the future pumping station PA114 at Børke.