the construction of a carpooling car park near motorway interchange No. 23 of the A7 motorway (ASF network): preparatory works, earthworks, sanitation, pavements, curbs, sidewalks, signage, various networks, equipment, etc. (non-exhaustive list of main works) on the Provence-Camargue Regional Operations Department (DRE PCA).
Asphalt demolitions: 2300 m2
Sidewalk demolition: 200 m2
Edge demolition: 630 ml
Earthworks in excavated material and disposal in approved landfill: 1835 m3
Compaction of the bottom of form and supply and implementation of class 5 geotextile: 3800 m2
Supply and implementation of GNT 0/63 for shape layer: 1700 m3
Supply and installation of PVC CR 8 Ø250 pipes: 120 ml
Supply and installation of D1000 inspection manhole, including cast iron pad: 10 u
Supply and installation of 60 x 60 grid manhole, including cast iron pad: 12 u
Supply and installation of overflow manhole basin D1000, including cast iron grid: 1 u
Supply and installation of a hydrocarbon separator with TN bypass: 1 u
Supply and installation of sleeves Ø63mm lighting including connections and laying bed: 710 ml
Supply and installation of lighting mast: 20 u
Supply and installation of lighting control cabinet: 1 u
Supply and implementation of BBSG 3 0/10 for tread (thickness 6 cm): 240 m3
Supply and implementation of an impregnation layer: 4000 m2
Draining pavers of thickness 8 cm including line of delimitation of places: 375m2
Deactivated concrete thickness 10 cm: 565 m2
Supply and installation of T2 borders including low edges and glued edges: 1195 ml
Horizontal signalling, continuous or batch lines: 705 ml
Vertical police signage: 50 u
Directional signalling stem: 1 u
Supply and installation of fence 2 m high rigid panels: 205 ml
Supply and installation of a waiting shelter: 1 u
Supply and installation of swivel jigs: 2 u
Planting a meadow: 450 m2