Civil engineering and pipeline construction
In the course of the construction project Tram-Westtangente, HW 5 has to be relocated to a length of approx. 5.0 km. In this tender approx. 2.2 km in the dimensions DN 800-1200 from the gate valve position (SST) Landsberg Str. to the SST south of Ammersee Str. (A 96) including crossing of the A96 by means of a branch tunnel in cut-and-cover construction. Furthermore, 2 SST must be rebuilt.