Electricity, heating, solar and nuclear energy | Tenderlake

Electricity, heating, solar and nuclear energy

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 October 2019
Closing Date:
05 November 2019
Location(s):
PL42 Zachodniopomorskie (PL Poland/POLSKA)
PL43 Lubuskie (PL Poland/POLSKA)
Description:
Gorzów Purchasing Group. Supply of electricity in the period from 01.2020 to 31.12.2020.

The subject of the contract is the supply of electricity in the period from 1.1.2020 to 31.12.2020 to 3 085 consumption points (PPE) with a total estimated volume (+/- 10%) 43 925.41 MWh, of which:

1) to premises and facilities (part 1 of the contract) - 29 487.10 MWh - a detailed list of PPE is attached as Annex 1a to the Terms of Reference;

2) for the purpose of road lighting (part 2 of the contract) - 14 438.31 MWh - a detailed list of PPE is attached as Annex 1b to the Terms of Reference.

The forecast electricity consumption indicated above is indicative and may differ from the amount of energy actually consumed during the contract period. Reducing or increasing the amount of energy consumed does not entail any consequences for the Ordering Party (recipients), except for the need to pay for the energy actually consumed at the rates specified in the contract.


Supply of electricity to premises and facilities

1. Number of measuring systems accounting for consumed electricity 1 788 pcs.

2. A detailed description of the collection points (PPE) the Employer has included in Annex 1a to the ToR.

3. Estimated electricity consumption during the contract period (+/- 10%) 29 487.10 MWh, of which:

Zone I 13 990.66 MWh;

Zone II 10 113.73 MWh;

Zone III 5 382.71 MWh.

The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.


Supply of electricity for the needs of road lighting

1. Number of measuring systems accounting for electricity consumed 1 297 pcs.

2. A detailed description of the collection points (PPE) has been placed by the Employer in Annex 1b to the ToR.

3. Estimated electricity consumption over the contract period (+/- 10%) 14 438.31 MWh, of which:

Zone I 13 249.18 MWh;

Zone II 1 189.13 MWh;

Zone III 0.00 MWh.

The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.

Download full details as .pdf
The Buyer:
Miasto Gorzów Wielkopolski
CPV Code(s):
09300000 - Electricity, heating, solar and nuclear energy
09310000 - Electricity