The municipality of Appenweier is planning the expansion and renovation of the town hall at Ortenauer Straße 13 in 77767 Appenweier.
Dismantling work:
75 m³ interior wall Break off aerated concrete
35 m³ reinforced concrete (wall, ceiling, stairs)
Break off 50 m³ of natural stone masonry
45 m³ interior wall HLZ masonry
1600 m² Wandputz
1200 m² gypsum boards suspended ceiling
560 m² roof tile beaver tail
1700 m² substructure wooden battens
1000 m² Zementestrich
7 t Stahlunterzüge
Deep foundation:
75 m micropiles GEWI D 32mm
68 kg micropiles GEWI D 40mm
Foundation floor slab:
15 m³ underpinning unreinforced
32 m³ WU in-situ concrete reinforces floor slab
90 m³ in-situ concrete reinforced (floor slab, stairs, foundation)
Concrete and reinforced concrete work
35 m³ WU in-situ concrete reinforced SB3 (ceiling, wall)
85 m³ in-situ concrete reinforced SB1 (ceiling, wall)
66 m³ in-situ concrete reinforced SB3 (ceiling, wall)
400 m² formwork SB1 wall
370 m² formwork SB3 wall
140 m² formwork SB1 ceiling
170 m² formwork SB3 ceiling
45 m² formwork SB3 staircase
41 t reinforcing steel B500B
Masonry work:
50 m² grouting quarry stone masonry (repair)
20 m² openings close HLZ masonry D 24cm
Steel construction work:
3 t Profilstahl S235JR