structural work
The subject of the tender are earthworks and shell construction work in the context of the construction of a school building and a sports hall.
This work includes the following areas:
earthwork
Laying of ground, heating, drinking water, gas and sewer pipes
together with associated shafts and earthworks
concrete work
Precast concrete parts
masonry work
Clinker work, exterior
Acoustic clinker work, interior
Waterproofing
Construction site equipment Main items (school building and sports hall)
Remove topsoil load feed storage approx. 3,100 m³
Remove topsoil approx. 1,660 m³
Loosen soil load promote storage approx. 12,270 m³
Bedding layer / frost protection layer, 50 cm approx. 7,010 m²
Sacrificial layer, 50 cm approx. 7,010 m²
Bedding/base course, 50 cm approx. 3,860 m³
Cleanliness layer, 5 - 10 cm approx. 6,340 m²
Frischbetonverbundfolie ca. 2.100 m²
In-situ concrete floor slabs, 20-60 cm approx. 6,260 m²
In-situ concrete foundations approx. 190 m³
In-situ concrete walls, 25 cm approx. 2150 m²
Precast concrete wall made of element wall panels, 25 cm, incl. filled concrete approx. 3,770 m²
In-situ concrete ceilings, 28 cm approx. 3520 m²
Element ceiling slab with concrete, 28 cm approx. 8,710 m²
TT ceiling slab with concrete, 15 cm approx. 550 m²
Precast reinforced concrete elements: stairs, platforms, seat steps, columns, beams
Prestressed concrete truss, saddle, H 120-175 cm, L 28 m 8 pieces
Prestressed concrete truss, lectern, H 80 cm, L 9.5 m 6 pieces
Reinforcing steel approx. 1,250 tons
Profilstahl, Rampenkonstruktion, Stahlkern-Verbundstützen ca. 12 to
KS masonry, 11.5 cm approx. 600 m²
KS masonry, 17.5 cm approx. 440 m²
KS masonry, 24 cm approx. 940 m²
facing masonry, clinker, exterior, incl. insulation approx. 4,350 m²
Veneering masonry, acoustic clinker, inside, incl. insulation approx. 370 m