Dismantling of the existing railway overpass Bw 27 (with steel superstructure) in Obercarsdorf and construction of a new bridge structure with steel superstructure in the same location as well as related measures (including new construction of adjacent supporting structures, measures on track systems (about 350 m), drainage systems and at 9 level crossings, production of cable trays) ,
Dismantling of the existing railway overpass Bw 27 (with steel superstructure) in Obercarsdorf and construction of a new bridge structure with steel superstructure in the same location as well as related measures (including new construction of adjacent supporting structures, measures on track systems (about 350 m), drainage systems and at 9 level crossings, production of cable trays) ,