Replacement construction Hasselbachplatz - delivery of catenary system
Magdeburger Verkehrsbetriebe GmbH & Co. KG is planning the construction of a new
Gleisvierecks Hasselbachplatz.
The traction power supply of the trams in the area of the track quadrangle
Hasselbachplatz is operated via an existing catenary network, which connects the
entire space spanned. For this reason, it is not possible and
necessary to renew the catenary. The replacement of the track quadrangle
takes place when the catenary is mounted. Since the position of the tracks has changed only slightly,
changes, at the end of the project, the catenary is fine-tuned to the
new track geometry adapted.
The catenary between the line divider in Hallische Straße and the
Track separator in the area of Gleisdreieck Leipziger Straße/ Halberstädter Straße
must be renewed in the course of the construction work.
The track quadrangle will be built in two construction phases.
In construction phase 1, the Sternstraße - Breiter Weg area will first be renewed.
In construction phase 2, the area Hallische Straße - Otto-von-Guericke-
Road renewed. After the track quadrangle has been renewed in the construction phases
, the catenary at Hasselbachplatz will be adapted to the new track position.
In the course of the road closure construction phase 2 in the area of Hallische Straße -
Hasselbachplatz, the catenary between the
Trennern Hallische Straße and the Gleisdreieck Leipziger Straße/ Halberstädter
Road, including renewal of the dividers.