Screed, mastic asphalt and coating work in the course of the general renovation of the playhouse for the Mannheim National Theatre.
In detail, the following services are to be commissioned:
Scope:
mastic smear
Processing of mastic asphalt stock approx. 20 m²
Trockenschüttung Perlite ca. 9340 m²
Levelling fill tied approx. 550 m²
Thermal insulation approx. 760 m²
Impact sound insulation approx. 9940 m²
Waterproofing bituminous approx. 220 m²
Waterproofing of plastic membranes approx. 140 m²
Built-in parts aluminium (angle, separating rails) approx. 1065 m
Randdämmstreifen ca. 9400 m
Gussasphaltestrich ca. 9780 m²
including substrate preparation, required connections to adjacent components, surface treatment slip resistance class R9 to R11
Cement screed
Kugelstrahlen ca. 1100 m²
Vapour barrier bituminous incl. primer approx. 2200 m²
Waterproofing of plastic membranes approx. 140 m²
Levelling fill bound approx. 810 m²
Thermal insulation approx. 35 m²
Impact sound insulation approx. 885 m²
Trennschicht PE-Folie ca. 1510 m²
Built-in parts aluminium (brackets, dividing rails) approx. 310 m
Built-in parts stainless steel (wall connection bracket) approx. 155 m
Randdämmstreifen ca. 2400 m
Zementestrich ca. 3840 m²
including substrate preparation, required connections to adjacent components
Cavity floor with calcium sulfate screed
System cavity floor with calcium sulphate screed approx. 115 m²
Randdämmstreifen ca. 175 m
Inspection openings 600/600 mm approx. 40 pieces
including substrate preparation, necessary connections to adjacent components, recesses, grinding of the sinter layer
Raised floor NSHV
Dust-binding paint approx. 45 m²
System raised floor, ready for surface approx. 45 m²
Skirting board PVC approx. 30 m
including substrate preparation, required connections to adjacent components, recesses, cable tray supports
Dry screed over gratings
Carrier board OSB 18 mm approx. 250 m²
Impact sound insulation approx. 250 m²
Randdämmstreifen ca. 95 m²
Dry screed 23 mm approx. 250 m²
including necessary connections/adaptation work to adjacent components
Waterproofing and coatings
Untergrundvorbereitung ca. 7400 m²
Kugelstrahlen ca. 6850 m²
Risssanierung ca. 300 m
Equipment base made of aerated concrete blocks approx. 15 m²
Dehnfugen ca. 100 m
Kitchen waterproofing system primer, intermediate and final coating R9 to R12 approx. 140 m²
Base design kitchen approx. 180 m
Impregnation / sealant transparent approx. 4720 m²
Floor coating colored primer, scratch filler, coating approx. 2400 m²
Refurbishment of floor coating Stock approx. 540 m²
Treppenkantenprofil ca. 500 m
Permanently elastic grouting approx. 5700 m
including substrate preparation, necessary connections to adjacent components, door sills
Substructure of the sprung floor of the ballet rehearsal hall
Backfilling floor duct with screed concrete approx. 2 m³
Vapour barrier bituminous incl. primer approx. 160 m²
battens 35/35 mm approx. 260 m
Load distributor OSB, 2-layer approx. 160 m²
Ausgleichsschüttung Perlite ca. 160 m²
including substrate preparation, required connections to adjacent components and coatings, door sills
resilient floor coverings
Kautschukbelag ca. 440 m²
Gumminoppenbelag ca.1040 m²
Step edge profile aluminium approx. 240 m
including substrate preparation, necessary connections to adjacent components, door sills
textile floor coverings
Carpet approx. 1120 m²
Step edge profile aluminium approx. 1140 m
including substrate preparation, necessary connections to adjacent components, door sills
Building data:
Existing GFA: 32.308 m²
Existing BRI: 161,555 m³
New building GFA: 3,577 m²
New building BRI: 18,161 m³
Usable area (NUF): approx. 28,425 m²