The entire study assignment mainly includes;
- The topographical measurement,
- The inventory and collection of data,
- the preparation of the preliminary draft,
- the preparation of the final draft,
- architectural integration,
- the drawing up of the implementation specifications,
- drawing up the necessary permit documents (including project EIA),
- the supporting processes such as BIM, stakeholder management, consultation,
document management, communication,
- assistance during implementation
-etc.
of the flood measures and appurtenances in the inner port of Ostend.
The entire study assignment mainly includes;
- The topographical measurement,
- The inventory and collection of data,
- the preparation of the preliminary draft,
- the preparation of the final draft,
- architectural integration,
- the drawing up of the implementation specifications,
- drawing up the necessary permit documents (including project EIA),
- the supporting processes such as BIM, stakeholder management, consultation,
document management, communication,
- assistance during implementation
-etc.
of the flood measures and appurtenances in the inner port of Ostend.